| |
![]() |
|||
|
|
||||
| November 2, 2001 Span D arrived a little before lunch and was assembled in front of the DeVos Communication building. The two halves fit together like a classic Erector Set. | ||||
| Preparations and Connecting | Lifting and Finishing | People | Home | ||||
![]() |
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
Next: Lifting and Finshing | |
| Contact
Luke Robinson |
||||