| March 13, 2002 Drywall and dust were in great supply on all four floors. On the outside the masons finished the north wall and the south windows are sealed. | ||||
| The Bridge | DeVos Communication Center | Prince Conference Center | ||||
![]() Before October 22, 2001 |
![]() 5 months later March 13, 2002 |
![]() Before November 16, 2001 |
![]() 4 months later March 13, 2002 |
|
![]() Drywall and ventilation. |
![]() The main lobby on the second floor.. |
![]() Windows fill the third floor hallway with sunlight. |
![]() The ground floor's main hallway. |
|
![]() Recording studio takes shape. |
![]() More "Calvin brick" surround two entrances. |
![]() Filling the seams along the first floor hallway. |
![]() 30 foot ceilings inside the new video studio. |
|
![]() Inside the loading dock. |
![]() Before Spelunking inside the utility tunnel, December 20, 2001 |
![]() 3 months later An operational tunnel on March 13, 2002 |
![]() Third floor hallway with lots of sunlight to go around. |
|
![]() Third floor classroom. |
![]() Third floor classroom. |
![]() A peak at the forth floor's HVAC. |