Team 12 is Finished as of May 19, 2009

As of February 12, the modeling for the portion of the Warner Drain south of 84th St is substantially complete.

Work to be done includes modeling different meteorological events and alternative testing.

 

On November 15, 2008, cross sectional data was gathered at the critical area of the Warner Drain where the majority of the flooding occured. Team 12 braved frigid temperatures to gather critical data that would enable an accurate model to be rendered.

Top Row: Ian stands with a surveyor's rod, Joel and Justin discuss elevation markings

Joel takes an elevation reading,

Bottom Row: Team 12 (from left: Justin, Ian, Joel, Becca) stand in front of a giant rooster, Joel, Ian, and Justin clean off the entrance to a culvert.