Added some content to the downloads page. Check back soon for a presentation update.
10 October 2008
Spring 2009 : Gantt Chart
View or download the progress we made in the spring semester : .xlsx (40.8 kB), .pdf (262 kB).
We have submitted our final report to Prof. Bossemeyer. It can be downloaded or viewed here.
Thanks to all our freinds and family who showed up for the Senior Design Open House! It was a lot of funa and we are glad to be done.
Andrew and Keith presented our last class presentation detailing the success of our prototype.
As we where taking a team picture for our Senior Design Night poster we found a baby duck. And here is picture of the CellSync Duck.
Mirrored the development computer to our prototype for the Senior Design Night and for final edits to the systems files.
We submitted a draft of our final design report to our team adviser, Prof. Bossemeyer.
The team presented our project to the Calvin Engineering Advisory Council (CEAC).
Keith and Phil meet with Gary Draving in the CS Department and he recommeneded big changes to our design project.
Keith and Phil both re-introduced the project to the class and include our progress so far. It can be found on the downloads page.
Added a preliminary Gantt Chart to this page. We will try to update it more as the semester progresses.
Today we received our telephone network interface card, and wired up a simple telephone network.
We have ordered our telephone network interface card.
Fall 2008 : Gantt Chart
View or download the progress we made in the fall semester : .xlsx (33.8 kB), .pdf (172 kB).
Jeffrey and Andrew did a good job of giving our second presentation today.
Submitted the Project Proposal and Feasibility Study to Team Advisor. Found on the downloads page.
The website is now up on the Calvin College Engineering page, here.
Submitted out Draft PPFS to Team Advisor.
Keith and Matt did well on giving our preliminanry design presentation today. The presentation can be found here.
Added the Industrial Consultant Brief to the downloads page. Presentation #1 update on 22 October 2008.