Check the progress page for construction pictures taken during the year.
05.03.2008 Senior Design Night is here and everything works perfectly!!!
05.02.2008 Applied a touch-up coat of paint to hovercraft after spending a few hours driving around Commons Lawn and the Seminary Pond.
05.01.2008 Refined throttle control, sanded and fiberglassed lift duct inlet, Final Report writing.
ARCHIVED NEWS
Calvin College Calvin Engineering Senior Design Projects
MAY 2008
Check the progress page for construction pictures.