LATEST NEWS

Check the progress page for construction pictures taken during the year.

05.03.2008
Senior Design Night is here and everything works perfectly!!!

05.02.2008
Applied a touch-up coat of paint to hovercraft after spending a few hours driving around Commons Lawn and the Seminary Pond.

05.01.2008
Refined throttle control, sanded and fiberglassed lift duct inlet, Final Report writing.

ARCHIVED NEWS

OTHER LINKS

Calvin College
Calvin Engineering
Senior Design Projects