Senior Design 03-04: Team 19

Project Proposal:
Our team’s goal is to structurally design and analyze a 25,000 sq ft. multi-purpose building for Shoreline Christian Schools in Shoreline Washington. We have the architectural drawings, and from these we will produce a set of structural drawings which will include the roof framing plan, floor framing plans, foundation plan, and details.
TEAM MEMBERS:

From Left to Right
Brendon Bain
Andy Bolton
Jeremy Jacobs
Kyle Shaver
PROJECT:
Project Abstract |
Task Specifications |
|
Architectual Drawings |
Structural Drawings |
|
Pictures of the site |
3D Model of Building |
