
Black & Veatch has created a facilities plan update for the WCWP. The facility plan reviews the entire wastewater treatment process for the WCWP, from pretreatment of water to the disposal of dewatered-solids to the discharge into the Grand River. The facility plan also discusses projected flows into the plant. The team has access to this report, as well as to the WCWP’s permit, plant layouts and flow data. WCWP also offered that the team can work at the plant whenever needed.
Ho, Chu-Fei H., Paul Pitt, Daniel Mamais, Carolyn Chiu, and Domenec Jolis. "Evaluation of UV Disinfection Systems for Large-Scale Secondary Effluent." Water Environment Federation 70.6 Sept. (1998): 1142-50. Print.
Huber, Marc M., Silvio Canonica, Gun-Young Park, and Urs von Gunten. "Oxidation of Pharmaceuticals During Ozonation and Advanced Oxidation Processes." Environmental Science and Technology 37.531 Jan. (2003): 1016-24. Print.
Zwiener, C, and F H. Frimmel. "Oxidative Treatment of Pharmaceuticals in Water." Water Resources 36.6 (2000): 1881-85. Print.
Personnel at the Wyoming Clean Water Plant have been very helpful in assisting us with our project.
© 2012 Calvin College and Wyoming Clean Water Plant. All rights reserved. Last modified May 8, 2012. |